Industries Served
Facility maintenance and repair for K-12 schools, campuses, and district administrative buildings — planned around the academic calendar, with the larger work saved for breaks and summer.
Summer and break project work — classroom refreshes, repainting, flooring, equipment rollouts — plus HVAC, plumbing, playground, roofing, and lot repairs during term.
When a leak, electrical fault, or HVAC failure affects a school day, AIOS coordinates emergency repairs with your facilities team. Our line is answered 24/7, and work is planned around affected spaces and campus access.
Facility types
Working around a school calendar
School maintenance splits by calendar: project work inside break and summer windows, responsive repairs during term.
Renovations, classroom refreshes, interior repainting, and rolling equipment projects scheduled into the vacation calendar, with completion dates set ahead of staff return and student occupancy rather than worked around them.
Comfort systems for classrooms, gyms, and cafeterias; plumbing and drainage for restrooms and kitchen areas; electrical and lighting for classrooms, corridors, and exterior safety lighting. Filter changes, checks, and repairs on a planned cycle.
HVAC & Refrigeration, Plumbing & Drainage, Electrical & Lighting
Playground equipment repair, replacement, protective surfacing upkeep, and use-zone review, scheduled for periods when the yard is unoccupied and held closed through any surfacing cure time and the applicable inspection sign-off before recess resumes.
Commercial roofing repair and inspection, lot striping and re-striping, asphalt and concrete repair for drive loops and sidewalks, and exterior maintenance. Drop-off and bus loop pavement takes concentrated morning and afternoon traffic, and closures there are scheduled against arrival and dismissal.
Doors and hardware, gym and hall fixtures, drywall patches, ceiling tiles, and the interior repairs that accumulate over a school year of heavy use.
Fire and life-safety system service and extinguisher inspection programs, performed by appropriately licensed professionals for those systems, plus security and access control coordination, with visits booked around school hours and secured-area access.
Storm debris and fallen-tree cleanup, emergency repair dispatch, water intrusion drying, and build-back coordination when a weather event closes a campus.
Storm Cleanup & Tree Services, Emergency Repairs & Restoration
Coordination
Across a district, requests are tracked per building and sequenced against the school calendar: summer painting, playground surfacing, and roof work at multiple sites are consolidated into one break schedule rather than booked as separate visits.
Break windows are set by the district calendar, so project schedules are built backward from the first day staff and students return.
Start a Program
Whether you manage one building or a district, the scope is built around your calendar, your site procedures, and the buildings that need the most attention first.
Each campus or building, the break windows available to you, and who approves work at the district level.
Contact
Already a client with a work request? Use the service request form.