Commercial Interior Work
Tenant improvements, commercial fit-outs, capital replacements, and brand rollouts planned around site access and operating requirements, with AIOS coordinating phasing around operations.
Scope
Project work splits into three patterns: improving a single building, repeating a standard across locations, and verifying installed work against the approved scope.
01
02
03
Surveys confirm site conditions and capacity before equipment or finishes are ordered, and completed installations are checked against the approved scope.
Ongoing upkeep after a project closes falls under Preventive Maintenance Programs.
Rollout Sequence
Project phasing is defined around approved scope, site conditions, access, and operating requirements. Multi-site work follows customer specifications, with site differences confirmed before scheduling.
Phase boundaries and shutdown windows are agreed with your team before mobilization, not decided on site.
Request a Project ProposalPhase 01
Phase 02
Scope, materials and allowances are fixed in writing so variations are visible rather than absorbed into the schedule. Drawing or engineering input is identified where it applies.
Phase 03
Work moves in agreed zones with dust and access control at each boundary. Trades are sequenced so no zone is handed back before its rough-in is inspected.
Phase 04
Each zone is walked against the approved scope before handback. Outstanding items are recorded, closed and reported per location.
Plan a Project
Location list, drawings or specifications if available, target opening or completion dates, and the standards the finished work must meet.
Direct Contact
Brad Moreland
National Project Manager
Managing several locations? The proposal request form is built for multi-site scopes.